Installation Process

move

Stage 1

Old roof is completely removed back to the joists.
X
move

Stage 2

Fascia’s are replaced and new 2400mm x 600mm x 18mm tongue and groove boards are fixed.
X
move

Stage 3

Appropriate fibreglass trims are applied around the full aspect of the roof. Chopped strand mattings are cut to size and applied with polyurethane resins which are consolidated to the tongue and groove boards. This is a one stage process to enable the resins to seamlessly bond ensuring waterproofing.
X
move

Stage 4

This demonstrates the completed resin process.
X
move

Stage 5

The roof and fibreglass trims are now lightly sanded to ensure a smooth finish.
X
move

Stage 6

Finally, a polyurethane coloured top coat is applied.
X